NEGROCOMMERC@proton.me

ul. Aleksandra Fredry 2/7 · 30-605 Kraków

Recently supplied

Shells we helped
close out.

Six programmes from the last two years, with the material schedule behind each one. Drag any image to see what the contractor started with.

Programmes shown
6
Combined area
15 260 m²
Cities
5
Repeat clients
4 of 6
Kazimierz tenement apartment, Kraków — before
Kazimierz tenement apartment, Kraków — after
Shell Finished

01 · Residential refurbishment

Kazimierz tenement apartment

City
Kraków
Area
218 m²
Year
2026
On site
19 weeks

A first-floor apartment in a protected Kazimierz tenement, stripped back to brick and joist. The conservation officer allowed no change to the window openings, so every build-up had to gain its performance in thickness we did not have.

Rockwool Frontrock on the internal face of the party wall, a floating Steprock floor to get the impact figure down for the flat below, and large-format Cerrad slab in the two bathrooms so the joint count stayed low on an uneven substrate.

Material schedule
GroupLineQty
FlooringBarlinek Pure Line Oak Askania 14 mm196 m²
Tiles & StoneCerrad Softcement White 119.7 × 279.768 m²
DrywallKnauf A13 + Diamant on CD 60310 m²
InsulationRockwool Steprock ND 30 mm188 m²
Dry MixesAtlas Plus C2TE S142 bags
PaintsTikkurila Harmony velvet matt94 L
  • Flooring
  • Tiles & Stone
  • Drywall
  • Insulation
Wola residential tower, Warsaw — before
Wola residential tower, Warsaw — after
Shell Finished

02 · Developer fit-out

Wola residential tower

City
Warsaw
Area
11 400 m²
Year
2026
On site
14 months

One hundred and forty apartments across twenty-two floors, handed over in six phases. The specification could not drift between phase one and phase six, fourteen months apart.

We reserved the full Egger decor batch and the Porta door programme against the contract at award, drew down against it phase by phase, and held the paint tint formulation on file so the final touch-up matched the first coat.

Material schedule
GroupLineQty
FlooringEgger PRO Large Aqua+ 8/32 EPL2019 840 m²
DoorsPorta Vector Premium W, leaf + frame612 sets
PaintsDulux EasyCare, tinted to scheme4 100 L
Dry MixesAtlas SAM 200 self-levelling1 240 bags
Tiles & StoneOpoczno Grand Wood Natural 14.7 × 891 980 m²
  • Flooring
  • Doors
  • Paints
  • Dry Mixes
Office floor fit-out, Katowice — before
Office floor fit-out, Katowice — after
Shell Finished

03 · Commercial fit-out

Office floor fit-out

City
Katowice
Area
3 250 m²
Year
2025
On site
11 weeks

Two floors of a 1990s office block taken back to slab and column grid, then rebuilt as open-plan with eleven meeting rooms and a two-hundred-seat floor plate.

Acoustic performance drove the partition build: Knauf Diamant both faces on staggered CW 75 with Rockmin infill, which hit 52 dB without doubling the stud. The floor takes trolley traffic all day, so it went to unglazed technical porcelain rather than a glazed gres.

Material schedule
GroupLineQty
DrywallKnauf Diamant 12.5 on CW 751 860 m²
InsulationRockwool Rockmin Plus 50 mm930 m²
Tiles & StoneNowa Gala Trend Stone 59.7 × 59.72 410 m²
Dry MixesCeresit CN 76 levelling compound680 bags
PaintsCaparol Samtex 7 E.L.F.820 L
  • Drywall
  • Insulation
  • Tiles & Stone
  • Dry Mixes
Townhouse kitchen and dining, Gdańsk — before
Townhouse kitchen and dining, Gdańsk — after
Shell Finished

04 · Residential refurbishment

Townhouse kitchen and dining

City
Gdańsk
Area
64 m²
Year
2026
On site
7 weeks

A compact ground-floor knock-through in a 1930s townhouse, with underfloor heating laid over an old suspended timber floor that had never been level.

A deep self-levelling pour brought the substrate into tolerance, then wood-effect gres rather than engineered board, because the heating loop runs at a temperature that would have moved solid oak.

Material schedule
GroupLineQty
Tiles & StoneOpoczno Grand Wood Natural 14.7 × 8964 m²
Dry MixesAtlas SAM 200 + Atlas Plus58 bags
DrywallSiniat Nida Woda GKBI42 boards
PaintsMagnat Ceramic scrubbable38 L
  • Tiles & Stone
  • Dry Mixes
  • Drywall
  • Paints
Mountain lodge living room, Zakopane — before
Mountain lodge living room, Zakopane — after
Shell Finished

05 · New build

Mountain lodge living room

City
Zakopane
Area
142 m²
Year
2025
On site
16 weeks

A pitched-roof lodge at 900 metres, where the roof build-up had to meet WT 2021 in a rafter depth the structural engineer would not increase.

Recticel PIR over the rafters carried the U-value in 100 mm where mineral wool would have needed nearly double. Clay tiles below, on a Dörken breather membrane rated for the freeze-thaw cycling at that altitude.

Material schedule
GroupLineQty
InsulationRecticel Eurothane Silver PIR 100 mm186 m²
Roofing & FaçadeCreaton Domino clay tile, engobe212 m²
InsulationDörken Delta-Vent N membrane4 rolls
FlooringBarlinek Senses Oak Cream 14 mm118 m²
  • Insulation
  • Roofing & Façade
  • Flooring
Ground-floor retail unit, Poznań — before
Ground-floor retail unit, Poznań — after
Shell Finished

06 · Retail fit-out

Ground-floor retail unit

City
Poznań
Area
186 m²
Year
2026
On site
5 weeks

A shell unit turned around in five weeks to hit a lease start date, with a floor rated for the footfall of a high-street food retailer.

AC6 laminate rather than vinyl, because the tenant wanted a warm floor and the maintenance regime suited it. Everything ordered as one sequenced delivery so the unit never held more than three days of material.

Material schedule
GroupLineQty
FlooringSwiss Krono Kronostep Avaros K598 AC6186 m²
DrywallRigips Habito H 12.5224 boards
PaintsDulux EasyCare Class 1142 L
Dry MixesAtlas Postar 80 + Uni-Grunt96 bags
  • Flooring
  • Drywall
  • Paints
  • Dry Mixes

Working on something like these?

Send the drawings. We will come back with a priced schedule, a wastage allowance and a delivery sequence — usually inside one working day.